Theory of Blast Event
Blast Event Rebound Effect How we design a structure able to resist to 0,5 bar static pressure Blast Resistant Tile
This is the elementary module able to resist at 0.5 bar of static pressure, made by special steel and concrete. We call it Tile, because the wall will be made as a mosaic of elementary modules. Now we will discover how is composed a Tile. 3D View
This is the elementary module with the following approximate dimensions: 1 meter by 1 meter with thickness of 130 mm
The Mosaic
The Tiles are bolted on the main structure of the wall. The main structure is made by opportune H beams. Dimension of the beams and distance between each beam will be determined in compliance with Blast Protection Theory. The Concept
Hart of the Tile is the Concrete. Concrete is able to protect from Blast and Fire. Sheets metal composing the Tile, are designed in compliance with Blast Protection Theory. Each Tile, bound on two side, it is able to resist against the Blast Even and the Rebound effect for an equivalent static pressure of 0.5 bar. Tile Characteristics
Weight is approximately 300 Kilos each. Handling and installation don't need particular mechanical operations. Anchorage system with bolts of each tail permits to reach a high level of precision. ALl that means that our structure has a good range of flexibility; therefore easy to adapt to any structure. Barriers of Protection
Mechanical Temperature Gas and Smoke Temperature Protection
From the fire-prevention theory and following the NFPA norms, we assume that 130 millimeters of concrete respect more than 120'. Thermo expandable gaskets on four side of the Tile will guarantee to block the heat. A further insulating element will be set as finish between a cell and the other. Gas and Smoke Protection
Special gaskets will guarantee the perfect seal of the elementary Tile on the four sides of the same on. A further insulating element will be set as finish between a cell and the other. Gaskets System
Process
Contruction Installation on site Transportation and delivery Gant diagram Construction
All the building process will be done in Italy During the whole procedure of building you could check the state of advancement, with some picture by email. Installation on Site
The easy handling and the great flexibility of this system allow any worker to be able to follow a detailed manual of assembly. The installation on site will be guided by a detailed manual of assembly. Transporation and Delivery
The goods will be packaged at our yard and arranged for delivery by ship.
Once we start with the job, we can give you a step by step all the process from the order to the delivery with dates and states of advancemet.
Product Keywords : blast, explosion, wall |
|
|
|